Construction Resumes!
After 1 1/2 years of lying dormant construction on studio has resumed. I started back
working on it in September of 2006. The entire building was cleaned out and all
my "junk" has been moved to storage in different places.

September 2006 - Adding porch to back of studio. It will be stamped concrete.

September 2006 - Adding walkway to front. Same stamped concrete.

October 22, 2006 - After 1 1/2 years of lying dormant construction begins again!
Keep hammering boys!

October 22, 2006 - The guitar ISO room.

October 22, 2006 - Control Room floor. This may work or may have to rethink...:-(